Munters Energy Recovery Purge reduces running costs and CO2 emissions

Die Eissporthalle Frederikshavn in Dänemark wurde 1964 gegründet und beherbergt den Frederikshavn Hockey Club, einen der ältesten Eishockey Clubs, der seit Jahren zu den Besten der dänischen Liga gehört.

With the installation of Munters dehumidifiers IceCentre North experienced significant improvements. Condensation on the transparent protective shields did not occur any longer which was highly appreciated by spectators. There was no longer any hazing across the ice during the game, and the degradation of the building’s wooden construction stopped. Improvements to the delight of both the athletes, spectators and the arena’s maintenance staff.
In relation to a more extensive energy optimization project in 2012 Energy Project Manager Johannes Thaarup from the Municipality of Frederikshavn contacted Munters for discussion on possible energy updates of the 2 Munters dehumidifiers.

More excess heat is now recycled

Most of the excess heat generated by the compressors used for ice production in the arenas was previously exhausted to a cooling tower before it was exposed into the open as waste heat. A big share of this excess heat is now instead led to a heat exchanger and recycled. In order to make use of this waste heat for the operation of the two dehumidifiers, those got equipped with a preheater for the regeneration air.
This conversion saves approx. 2/3 of the energy that was previously used by the electric air heater for heating the air stream for regenerating the rotor.
An internal heat recovery sector, the so-called PowerPurge, was additionally built into the MXT7500. Power Purge recycles a part of the air stream from the rotor’s regeneration zone, preheating the main regeneration air stream thus reducing the need of external heat supplied.

Pay back time at only 1½ year

The estimated energy saving of the above updates grants a payback time of less than 1 ½ years and a reduction of CO2 emissions of 40 tons/year. As IsCenter North furthermore could benefit from a local public energy saving pool, the payback time was reduced to only 9 months. Already now, less than a year after the updates, the real energy savings seems to exceed the expectations. A full months extra
operation this summer was conducted without increasing the expected total energy consumption.

The energy optimization project also included an update of the central CTS system. Today the CTS system controls all key functions in the arenas, including ventilation, dehumidification, lighting, ice production, ice temperature, heating etc.
The free excess heat from the heat exchanger is first of all used to heat the domestic water, secondly for operation of the dehumidifier's preheaters and last but not least for the ventilation systems. In case of periods with insufficient amount of excess heat, the preheaters on the dehumidifiers will be run by district heating.


Savings are returned to the users

In order to increase the incentive to implement energy optimization in municipal institutions, the city of Frederikshavn recently launched an "incentive project". The project ensures that half of the money saved on energy optimization is returned directly to the specific institution and can be used according to own wishes, e.g. for a new ice machine.

Entfeuchtung gewährleistet verbessertes Klima

Seit die Entfeuchter von Munters installiert wurden, konnte die Eissporthalle erhebliche Verbesserungen vermelden. So bildet sich nicht länger Kondenswasser auf den Schutzglaswänden, was die Zuschauer natürlich begrüßen. Auch legt sich während des Spiels kein Schleier mehr über das Eis und der Verfall der Holzkonstruktionen im Gebäude wird aufgehalten. Sowohl die Sportler als auch die Zuschauer und das Wartungspersonal profitieren von diesen Verbesserungen.

In Rahmen eines weitreichenden Energieoptimierungs- Projekts im Jahr 2012 kontaktierte der Projektleiter Johannes Thaarup von der Gemeinde Frederikshavn die Experten von Munters, um über Möglichkeiten der Energieoptimierung für die beiden Entfeuchter zu diskutieren.

Mehr überschüssige Wärme wird nun wiederaufbereitet

Bisher wurde der größte Teil der überschüssigen Wärme aus den Kompressoren der Eisproduktion in einen Kühlturm geleitet, bevor sie dann als Abwärme nach außen abgegeben wurde. Stattdessen wird die überflüssige Wärme nun zu einem Wärmeaustauscher geleitet und dort für den Betrieb im Entfeuchter genutzt. Zu diesem Zweck wurden die beiden Luftentfeuchter mit einem Vorerhitzer für die Regenerationsluft nachgerüstet. Auf diese Art werden 2/3 der Energie eingespart, die zuvor von der elektrischen Heizung benötigt wurden, um den Rotor zu regenerieren.

Der MXT7500 Luftentfeuchter wurde zudem mit einem internen Wärmerückgewinnungssektor, einem sogenannten EnergyRecoveryPurge nachgerüstet. Dieser entzieht einen Teil des Luftstroms aus der Regenerationszone des Rotors und führt ihn dem Hauptluftstrom für die Regeneration wieder zu. Dadurch reduziert sich der Bedarf an externer Wärmezufuhr.

Schnelle Fakten

  • überschüssige Wärme wird nun vollständig genutzt
  • Bedarf an elektricher Heizung für die Regeneration des Rotors wird um 2/3 reduziert
  • CO2 Emissionen werden um 40 Tonnen jährlich reduziert
  • Amortisationszeit von nur 1½ Jahren