메시지 전송 시, 오류가 발생하였습니다. 재시도하십시오
메시지 전송 시, 오류가 발생하였습니다. 재시도하십시오
WMG's Energy Innovation Centre comprises a battery characterisation lab plus an electric / hybrid drives test facility. The Centre includes a cutting edge £13m Battery Materials Scale-Up Pilot Line. This provides a one-stop-shop for the development of new battery chemistries and detailed industrial evaluation for target applications such as, automotive, power grids and consumer electronic products.
The Centre includes a cutting edge £13m Battery Materials Scale-Up Pilot Line. This provides a one-stop-shop for the development of new battery chemistries and detailed industrial evaluation for target applications such as, automotive, power grids and consumer electronic products.
Munters specialist air treatment team, designed, supplied and installed the energy efficient Dry Room with Munters high efficiency MDU system with innovative heat recovery design at the heart of the system.
A constant -45°C dewpoint provides a stable environment, which is critical for keeping the electrolytes as dry as possible while producing and testing lithium pouch cells. Any moisture ingress at electrolyte filling can be detrimental to battery performance.
Conditions are maintained using Munters MDU system located next to the dry room, from here all moisture levels are monitored using an integrated Siemens control system. Munters MDU2000 with a built in high efficiency energy recovery design has
The 9m x 5m Dry Room is just one part of the Pilot Line, accommodating up to 6 personnel, with a relative humidity of less than 1% and a continuous dewpoint of -45°C.
The Dry Room contains all the pouch cell making equipment where moisture sensitivity on cell materials becomes an issue after drying of electrodes such as:
• Electrode Drying and Cropping
• Stacking into cell stack
• Insertion into pouch
• Electrolyte filling
Conditions are maintained using Munters MDU system located next to the dry room, from here all moisture levels are monitored using an integrated Siemens control system. Munters MDU2000 with a built in high efficiency energy recovery design has a desiccant wheel at the heart of the air
treatment system.
아이디 또는 비밀번호를 다시 확인하세요
오류. 나중에 다시 시도하십시오
비밀번호를 잊으셨나요?
아이디 또는 비밀번호를 다시 확인하세요
오류. 나중에 다시 시도하십시오
Check your email within a couple of minutes to reset your password, if you can’t see any incoming messages try to check into your spam folder!