A manufacturer of nitrobenzene and other petrochemicals enhanced their column capacity and increased recovery of nitrobenzene from the effluent with Munters' mega valves and expertise.

Background
Company is a leading manufacturer of aniline, nitrobenzene and toluene di-isocynate.

Process Overview
One of the main finished products, nitrobenzene (NB), stream from the plant and is washed with water to remove dissolved acids. The resulting effluent water containing some amount of nitrobenzene needs to be further stripped in the steam stripper to reduce the nitrobenzene concentration, thus reducing load on the effluent treatment plant (ETP).

Customer Requirements
The customer was in the process of revamping the nitrobenzene plant in order to increase capacity. They wanted to check if the existing steam stripper with valve trays having a capacity of 12m3/hr could handle the effluent generated from revamped plant generating 16m3/hr of effluent after revamping.

Problem analysis
Munters studied the existing stream stripper and concluded that:

  • The existing trays would not sustain the increased load of 16m3/hr.
  • Final bottoms from the existing column contained 1600-2000 ppm of nitrobenzene, this effluent resulted in increased load on ETP plant since the COD value was high.
  • The pressure drop of the column was high which was resulting in increased energy consumption.

Solutions provided
Munters suggested replacement of existing steam stripper valve trays with high capacity valve trays to reduce the pressure drop across the column and increase the column capacity to 16m3/hr.

The column hydraulic ratings using mega valve trays was done. Munters had internally anticipated reduction of nitrobenzene concentration of effluent to 500-800 ppm level.

Accordingly, the trays were manufactured, supplied and installed.

Results achieved
The steam stripper with mega valves after commissioning achieved:

  • Enhanced capacity of 16m3/hr.
  • Reduction of nitrobenzene concentration to 600 – 1000 ppm level.
  • Recovery of 300 kg/day additional nitrobenzene from the effluent.

Schnelle Fakten

  • Customer: Petrochemical industry
  • Location: Western India
  • Tower Name: Waste water stripper
  • Tower Diameter: 800 mm
  • Mass Transfer Equipment: Tower Trays (Valve Trays)

Wie können wir Ihnen helfen?

Bitte leiten Sie mich zur allgemeinen Startseite weiter.
Durch Ihre Auswahl stimmen Sie unseren Cookie-Richtlinien zu

Ungültige Benutzerkennung

Es ist ein Fehler ist aufgetreten! Bitte versuchen Sie es später noch einmal.

Ungültige Benutzerkennung

Es ist ein Fehler ist aufgetreten! Bitte versuchen Sie es später noch einmal.